About the Project
Star King Solomon Academy occupies a former council building, where areas of the existing car park had become the children’s outdoor play spaces.
The school wanted to completely rethink these large areas, making them feel less like a car park and creating engaging, welcoming playgrounds that would improve outdoor provision for pupils across the age range.
Future development was also an important consideration. The playground needed to work for the school now, while allowing the space to be divided into two separate playgrounds in the future without requiring a complete redesign.
The initial focus was the EYFS playground, followed by improvements to the existing undercroft area.
The Customer and Objectives
The aim was to bring large, uninspiring areas of tarmac and concrete to life and create spaces where children could play, learn and explore.
For the EYFS area in particular, the school wanted a playground that offered a broad range of play and learning opportunities, while also encouraging children to become more independent in how they use and access resources.
Our Approach
A key part of the transformation was changing the overall feel of the environment. We used a combination of artificial grass, wetpour rubber and loose-fill surfacing to disguise the old tarmac, concrete and car park markings, introducing colour, texture and clearly defined areas for different types of play.
For the EYFS playground, we created a varied environment supporting physical and active play, communication and social interaction, imaginative and role play, sensory and messy play, construction and problem-solving, creativity, and exploration of the natural world.
Child-accessible storage was incorporated into the playground too, giving children greater independence to select, use and put away their own play resources.
The space was designed as one cohesive playground while carefully considering how it could be divided into two separate playgrounds as the school develops in the future.
The undercroft presented a different challenge. Here, surfacing played a major role in transforming what had previously felt like a covered car park into a brighter, friendlier and more inviting space for pupils to use and enjoy.
As a substantial project taking place over several weeks during term time, the installation was carefully coordinated with the school to minimise disruption.
Feedback and Impact
The completed project has completely changed the character of the outdoor areas, replacing large expanses of tarmac and concrete with welcoming spaces that encourage children to move, explore, create, socialise and learn through play.
Careful planning has also ensured the playground can continue to evolve alongside the school, with the flexibility to adapt the space as its needs change in the future.
The school summed up their reaction simply:
“We are totally happy with it. Absolutely love it. Thank you.”
Key Features
- Clamber stack & climbing equipment
- Road track
- Water & messy play
- Construction area
- Stage, seating & musical play
- Trail & balance equipment
- Child-accessible storage
- Planting & raised sleeper beds
- Artificial grass & wetpour surfacing
- Loose-fill play areas
- Privacy screening
- Future-proofed playground design